Ergon Bio Tank-Digestor
Warning: Non-Compliance Consequences
Any performance issues or failures arising due to non-dosing, incorrect dosing, or misuse shall be treated as user non-compliance and will not be covered under warranty, free service, or routine maintenance support.
Fees Consultation & Site Visit Charges
If technical assistance or a site visit is required due to non-compliance with the prescribed dosing schedule, a consultation and inspection charge of ₹5,000 (Rupees Five Thousand Only) shall be applicable.
This charge covers technical assessment and site inspection and is payable by the Client Upfront.
Client Scope:Dewatering & Rectification Scope
Any requirement for tank dewatering, sludge removal, flushing, or corrective works resulting from non-dosing or misuse shall be entirely under the client’s scope, including all associated costs, labor, and logistics.
Standard : Environmental & Eco-Compliance
Ergon Bio Tank systems are eco-friendly by design and rely on maintaining a healthy biological balance. Strict adherence to recommended dosing, operation, and maintenance practices is essential for environmental performance and regulatory compliance.
Clause : Limitation of Liability
Ergon INC shall not be liable for any losses, damages, performance failures, or environmental non-compliance resulting from deviation from prescribed usage, dosing schedules, or operational guidelines.
Reference
- Ergon INC – Bio Tank Operation & Maintenance Manual
- Ergon Bio Cleanser Dosing Guidelines
- Applicable CPHEEO / IS 2470 principles (where relevant)










| Sl. No | Application Type | Bio Tank Configuration | Unit Pack Size | No. of Packs | Total Quantity | Dosing Cycle | Usage Notes |
|---|---|---|---|---|---|---|---|
| 1 | Residential – Small | 1 + 2 Bio Tank | 100 g | 2 Nos | 200 g | 6 Months | Suitable for small/twin Bio Tank systems with moderate load |
| 2 | Residential – Medium | 2 + 3 Bio Tank | 100 g | 4 Nos | 400 g | 3 Months | For apartment clusters & higher occupancy Bio Tanks |
| 3 | Kitchen / Canteen Connected Bio Tank | High Organic Load | — | — | 600 g | 2 Months | Handles grease, food waste & oil-heavy discharge |
| 4 | Project Installations | Bio Tank linked ETP / STP | 1 Kg | As required | Capacity Based | As per technical advice | Dosage finalized based on hydraulic & organic load |
1.0 Scope — Bio Tank Application
3.0 Biological Process Basis
• Hydrolysis of complex organics
• Acidogenesis — volatile fatty acids
• Acetogenesis — acetic conversion
• Methanogenesis — methane phase stabilization
4.0 Microbial Composition
5.0 Enzyme Activity
• Protease — protein breakdown
• Lipase — grease digestion
• Amylase — starch conversion
• Cellulase — fiber reduction
• Esterase — organic ester digestion




